Sunday, May 27, 2012

Hoopa Valley Tribe moves against salmon-killing dams: Tribe petitions FERC to reassert jurisdiction


Late last week the struggle over the future of four mainstem Klamath River dams entered a new phase. On May 25th attorneys representing the Hoopa Valley Tribe (HVT) filed a petition with the Federal Energy Regulatory Commission (FERC). In the petition the Tribe asks FERC to issue a Declaratory Order:
             “(a) finding that the license applicant, PacifiCorp, has failed to diligently pursue re-licensing of the Klamath Project; (b) ordering PacifiCorp’s re-license application dismissed; and (c) directing PacifiCorp to file a plan for decommissioning of Project facilities.”

The Petition comes in the wake of yet another delay by the State of California in processing PacifiCorp’s application for certification that the company’s Klamath Hydroelectric Project (Project) meets Klamath River water quality standards. Those standards were established by the State of California to protect beneficial uses of the River’s water. Beneficial uses include salmon and steelhead and tribal cultural uses as well as swimming and recreation.  The certification is necessary before FERC can issue a new license for operation of the Project. 

 The Hoopa Valley Tribe's Governing Council has led efforts to
scuttle the KHSA and return the fate of PacifiCorp's dams to FERC

California Water Board fails to act

Those who believe that the Klamath Dam Deal – the Klamath Hydroelectric Settlement Agreement or KHSA– is not in the public interest and will substantially delay removal of PacifiCorp’s Klamath River Dams, had hoped the California’s Water Resources Board – the SWRCB - would end the charade in which PacifiCorp withdraws and refiles its application for clean water certification each year. That maneuver causes FERC to delay a relicensing decision and instead to issue a one-year license for operation of the Project. So far the application for clean water certification has been withdrawn and refiled four times. Since PacifiCorp’s prior license expired, a total of six annual operating licenses have been issued by FERC.  

The delay in processing PacifiCorp’s relicensing application has allowed the company to operate its Klamath dams and powerhouses for six years without making changes already ordered in the FERC relicensing proceedings. Those changes include installing fish ladders and curtailing “ramping” in areas between the four dams. HVT wants to end the delays; it wants FERC to either order removal of the dams or to relicense PacifiCorp's Klamath Hydroelectric Project with fish ladders, new "ramping rates" and other changes designed to aide Klamath Salmon.

“Ramping” refers to the practice of cutting Klamath River flows between the dams to a trickle in order to maximize electric generation during parts of the day when wholesale electric rates are marginally higher, then turning the River back on and cutting electric generation when the wholesale rate is marginally lower.  “Ramping” is the key to Klamath Hydroelectric Project profitability.

Six years ago, an administrative law judge issued binding rulings as part of the FERC relicensing process. Attention focused then on the judge’s order that fish ladders would need to be installed on the dams. Of greater ultimate impact, however, was the judge’s finding that “ramping” as practiced by PacifiCorp was damaging resident Red Band trout and would need to be dramatically curtailed under a new license.

The “ramping” order meant PacifiCorp would lose up to $24 million each year if its Klamath Hydroelectric Project were relicensed.  That is what motivated the company to seek the KHSA Dam Deal. Under that Deal, PacifiCorp gets to walk away from the dams and facilities it owns free from responsibility for dam removal and free from all liability for toxic legacies which are likely lurking around 100 year old powerhouses.  

Under the KHSA Dam Deal, PacifiCorp shareholders would pay nothing to decommission the dams and powerhouses they own; instead taxpayers would pick up the shareholders’ costs. KlamBlog believes the KHSA is at its heart a deal tailored for the “1%” paid for by the “99%”.

 Warren Buffett - one of the world's richest men - is PacifiCorp's dominant shareholder

Will FERC act?

As the HVT notes in their petition, only Congress can authorize federal agencies to take on responsibility for dams and powerhouses PacifiCorp owns and only Congress can make federal taxpayers assume liability for PacifiCorp’s toxic legacies.  Since the required legislation is stalled in Congress, HVT believes FERC should reassert jurisdiction and order the company to decommission the Project it owns.

The HVT also points out in their petition that, in order for the KHSA Deal to move forward, the State of California must pass a bond measure by which California taxpayers will pay $250 million to remove PacifiCorp’s obsolete dams. But like the needed federal legislation, the California bond measure has been delayed and may never reach the ballot. California’s dismal financial position as well as opposition to new Sacramento Valley dams and a new pipeline to carry Sacramento and Trinity River water to Southern California, makes passage of the so-called “California Water Bond” unlikely any time soon.         

The HVT argues that poor prospects for federal legislation and for the California Water Bond should motivate FERC to end the delays, reassert jurisdiction, and to either order PacifiCorp to file a plan for decommissioning the Project or to relicense it with new requirements including fish ladders and reduced “ramping”. 

How FERC will respond is unknown; this is new territory for the Commission – an unprecedented situation. Will FERC tire of the state certification charade and reassert jurisdiction? Or will appointed Commission members – like members of the SWRCB – bow to the desires of those who hold the power to reappoint them?  FERC commissioners are appointed by the President for five year terms.

In the service of the 1%

It is clear that the Obama Administration's Interior Department wants the KHSA to proceed. They need the Dam Deal in order to carry the most controversial provisions of the KBRA Water Deal. If FERC reasserts jurisdiction over the fate of PacifiCorp’s dams, the KBRA can proceed - but it will be unlikely to secure the Congressional mandates and funding its promoters desire. 

The two deals have been artificially joined for purely political purposes.  The only thing they have in common is that both are at their core special interest deals for the 1% at the expense of the 99%.

 
 Seven very well off irrigators control much of roughly 200,000
irrigated acres within the Bureau of Reclamation's Klamath Project 

KlamBlog has argued that the KBRA Water Deal is not in the interest of the Klamath River or Klamath Salmon. Among other features, in order to maintain an over-sized Klamath Irrigation Project, KBRA legislation pending in Congress would lock-in Klamath River flows which are the minimum needed for survival of Klamath River Salmon. Like the HVT, we believe Klamath River communities deserve river flows which will restore salmon to abundance…not just keep them from going extinct. Abundant Klamath River Salmon will provide benefits to all Klamath River communities; the KBRA Water Deal mostly benefits the small group of irrigators who dominate Klamath Project irrigation. 

Does the HVT hold a trump card?

Whether or not FERC grants the HVT’s petition, it is likely that the Tribe has other arrows in its quiver with which it can attempt to end the multi-year delay in dealing with PacifiCorp's Klamath dams. The Hoopa, for example, are the only Klamath River Basin tribe which has the status of a state when it comes to the Clean Water Act. HVT has established its own water quality standards for the Klamath River and presumably can take action when its standards are not being met to compel action by those who are in violation. PacifiCorp's dams are in violation of both HVT and State of California water quality standards. 

This fall a large run of Chinook salmon is expected to enter the Klamath River at a time when flow conditions are likely to approximate those seen in 2002 when up to 60,000 adult salmon perished as a result of low flows and overcrowding.  The low flows expected this fall are a product of the KBRA Water Deal which guarantees that those irrigators who receive federally subsidized water will get roughly the amount of water they received on average before the Endangered Species Act began to limit irrigation water delivery. Application of the ESA is now being tailored by federal bureaucrats to comply with the “regulatory relief” promised in the KBRA. This fall we may get to see how well or poorly that works when a large run of salmon enters the Klamath River.  

KlamBlog will be on the scene; unlike many of those who seek to determine the Klamath River’s future, we actually live in the Basin. We’ll report on what transpires this fall, debunk the spin put on those events by federal bureaucrats, politicians, interest groups and others and we’ll interpret what it all means for the Refuges, the River, Klamath Salmon and Klamath River Basin communities.
Stay tuned.  
_________________________________

At publication time, the Hoopa Valley Tribe’s Petition to FERC is not yet available on line. For that reason we provide a copy of the petition below. For the convenience of the reader, we have eliminated page numbers, omitted the proof of service and we have moved all footnotes to the end of the document. 


                 BEFORE THE UNITED STATES OF AMERICA
             FEDERAL ENERGY REGULATORY COMMISSION


In re Klamath Hydroelectric Project     )
                                                        )     FERC Project No. P-2082
License Applicant: PacifiCorp )           )
_____________________________     )

                PETITION OF HOOPA VALLEY TRIBE FOR DECLARATORY ORDER

I. INTRODUCTION

Pursuant to 18 C.F.R. § 385.207(a)(2), the Hoopa Valley Tribe, party-intervenor in this
proceeding regarding re-licensing of the Klamath Hydroelectric Project (P-2082) hereby
petitions the Commission for a declaratory order: (a) finding that the license applicant,
PacifiCorp, has failed to diligently pursue re-licensing of the Klamath Project; (b) ordering
PacifiCorp’s re-license application dismissed; and (c) directing PacifiCorp to file a plan for
decommissioning of Project facilities.

Alternatively, the Tribe petitions the Commission for a declaratory order finding that the
State of California Water Resources Control Board (SWRCB) and the Oregon Department of
Environmental Quality (ODEQ) (collectively, the “States”) have failed to act on PacifiCorp’s
applications for water quality certification, first filed in 2006, within the one-year time limit
required under Section 401 of the Clean Water Act1 and have waived their certification authority.
If the Commission determines that the States have waived their authority, it should proceed to
issue a new license to PacifiCorp, including the mandatory Section 4(e) and Section 18
conditions prescribed by the Departments of Interior and Commerce in 2007. The time has come
for the Commission to re-assert its jurisdiction over the Project and require PacifiCorp to either
comply with current applicable law in a new license, or alternatively decommission the Project.

PacifiCorp’s failure to diligently pursue re-licensing and the States’ agreement with
PacifiCorp to hold their Section 401 proceedings in perpetual abeyance have effectively divested
the Commission of its licensing authority in this proceeding. To date, this arrangement has
allowed PacifiCorp six additional years of post-license power generation under the terms of its
1950’s era-license – with many more years of anticipated unregulated operation to come.
PacifiCorp’s fifty-year license to operate the Klamath Hydroelectric Project expired on March 1,
2006. Since that date, PacifiCorp has continued to operate the Project under annual licenses that
incorporate terms and conditions originally issued in 1954. The annual licenses lack conditions
that would be required under current law and that are necessary to mitigate for the Project’s
significant impacts to water quality, fish, and other aquatic organisms in the Klamath River.

Although FERC long ago completed all the steps necessary to re-license the Klamath
Project with terms, conditions, and mitigation measures required by current law, PacifiCorp has
permanently stalled the re-licensing through a contract known as the Klamath Hydroelectric
Settlement Agreement (KHSA).2 Consistent with the KHSA, the States have committed to not
act on PacifiCorp’s applications for certification under Section 401 of the Clean Water Act (the
last necessary step to complete re-licensing), holding the re-licensing in a state of abeyance
without FERC consent. In a purely technical charade designed to circumvent FERC authority,
PacifiCorp withdraws and re-submits its applications for certification each year although it is
clear that neither PacifiCorp nor the States intend for any action to be taken on the applications.

The Tribe requests that FERC either dismiss the re-license application for lack of diligent
prosecution or find that the States, as a matter of federal law, have waived their authority under Section 401 of the Clean Water Act. Once FERC deems the Section 401 certifications waived, it should proceed to issue a new license to PacifiCorp that includes the mandatory prescriptions filed by Interior and Commerce pursuant to Section 4(e) and 18 of the Federal Power Act, in addition to other necessary conditions. The public interest requires that FERC end the delay, re-assert control, and move this proceeding toward either re-licensing or decommissioning.

II. STATEMENT OF FACTS

A. BACKGROUND OF THE KLAMATH HYDROELECTRIC PROJECT

In 1954, the Federal Power Commission issued a fifty year license for operation of the
Klamath Hydroelectric Project on the Klamath River in southern Oregon and northern
California. The Commission subsequently changed the effective date of the license to March 1,
1956. That license, currently held by PacifiCorp, expired on March 1, 2006. Since license
expiration, PacifiCorp has continued to operate the Project on the same terms of the 1954 license
under the authority of annual licenses issued by FERC. PacifiCorp’s application to re-license the
Project (filed in 2004) remains pending in a state of perpetual delay before FERC.

In 2006, the Departments of Interior and Commerce filed conditions and prescriptions for
inclusion in the Klamath Project license under the authority of Section 4(e) and 18 of the Federal
Power Act. These conditions include provisions for minimum flow and fish passage, among
others, that would provide substantial mitigation to the imperiled water and fish resources of the
Klamath River. PacifiCorp unsuccessfully challenged these terms and conditions in a trial-type
evidentiary hearing pursuant to the Energy Policy Act of 2005, Public Law 109-58, § 241.

In September 2006, after reviewing extensive testimony from federal, tribal, state, and
non-governmental entities, Administrative Law Judge Parlen McKenna dismissed PacifiCorp’s
challenges, finding that the Section 4(e) and Section 18 conditions were supported by the
evidence in the record and necessary for the protection of affected fish and water resources of the
Klamath River.3 In early 2007, the Departments of Interior and Commerce filed their final
mandatory Section 4(e) and Section 18 prescriptions.4 Yet, five years later, PacifiCorp continues
to operate without these conditions and prescriptions in effect. FERC must include these
mandatory measures in any new license issued for the Klamath Project.5

FERC published its Final Environmental Impact Statement and completed its
environmental analysis of the Klamath re-licensing well over four years ago, on November 16,
2007. The FEIS confirms that the Project results in significant, presently un-mitigated, impacts
on the Klamath River environment. No regulatory agency disputes the significant impacts
caused by the Project. FERC and the respective federal agencies have completed all steps
necessary to re-license the Klamath Project with the mandatory protective terms and conditions.
The only missing requirement is issuance or waiver of Section 401 water quality certification.6

B. BACKGROUND RELATING TO THE KLAMATH HYDROELECTRIC

SETTLEMENT AGREEMENT AND ITS EFFECT ON RE-LICENSING.

In 2008, PacifiCorp, the States of California and Oregon, and the United States signed an
Agreement in Principle (“AIP”) providing that Oregon and California resource agencies would not impose “significant costs” on PacifiCorp (absent PacifiCorp’s consent) relating to water
quality certification studies during negotiation of the KHSA.7 The intent and effect of this
provision was to de-rail Section 401 certification studies and proceedings pending in the States.

In February 2010, PacifiCorp completed negotiations and executed the KHSA, in which
the States agree to put the Section 401 certification process in abeyance.8 PacifiCorp, through
the KHSA, has effectively suspended the FERC re-licensing process until at least 2020 (the year
in which the KHSA, Section 7.3, provides that decommissioning might commence), allowing
itself at least fourteen additional years of unmitigated power generation beyond the date of its
license expiration. Significantly, if the KHSA fails or terminates (which is likely), the process
will simply return to FERC for additional (but significantly delayed) re-licensing proceedings.

FERC has not approved the KHSA. Given PacifiCorp’s express request that FERC take
no action on the KHSA, and the lack of any proceedings initiated by FERC regarding the KHSA,
it is not clear whether FERC has even reviewed the KHSA or understands its effect.9 Contrary to
the claims of PacifiCorp and its supporters, the KHSA is not an agreement to decommission or
remove the dams of the Klamath Project. The KHSA does not require the removal of any dams
of the Klamath Hydroelectric Project, but instead establishes a planning process that could
potentially lead to the commencement of project decommissioning in 2020. Such
commencement of decommissioning in 2020 is highly speculative and doubtful, because such
potential decommissioning is expressly subject to the achievement of contingent events that
include, but are not limited to: (a) enactment of comprehensive federal legislation; (b) California
voter approval of a $250 million bond package; (c) an affirmative determination by the Secretary
of the Interior that dam removal is in the public interest; and (d) separate concurrences by the
states of Oregon and California that dam removal is in the public interest.10 If any of these
events fail to occur, decommissioning and facilities removal will not occur.11

There is no evidence that even one of the required contingencies will occur. Now, two
years after execution of the KHSA, no federal legislation supporting the KHSA has been
passed.12 Similarly, action on the required California bond package has been deferred until
November 2012 at the earliest. The Secretarial Determination has not been issued, despite the
agreed-upon target of March 31, 2012 in Section 3.3.4 of the KHSA. Finally, the concurrence of
the Governors of the States of Oregon and California (which is a purely discretionary political
decision) is far from guaranteed as both of the respective Governors that signed the KHSA are no
longer in office. In sum, the established deadlines for action in the KHSA have passed with not
one contingency satisfied and the KHSA is now expressly terminable (although no party has
invoked termination).13 It is extremely unlikely that all the KHSA’s necessary contingencies for
dam removal will occur, if any. Absent immediate FERC intervention, the only certainty is
continued delay and continued operation of the Klamath Project by PacifiCorp on the terms of a
long-expired license. The current status quo is not in the public interest.

C. BACKGROUND RELATING TO WATER QUALITY CERTIFICATION.

PacifiCorp applied for water quality certification from the California SWRCB on March
29, 2006.14 PacifiCorp withdrew and re-submitted its application on February 28, 200715 and
again on February 22, 2008, and again in 2009, 2010, and 2011.16 PacifiCorp engaged in the
same practice of submitting, withdrawing, and re-submitting its applications with the Oregon
DEQ during this same time-period, most recently withdrawing its application in January 2012.17

Significantly, PacifiCorp does not actually desire the States to process its applications, nor do the States intend to. The withdrawals and re-submissions are merely a contractually mandated charade designed as an attempt to continually re-start the one year maximum time frame provided in Section 401 of the Clean Water Act and delay license issuance.18  By continuing to withdraw and re-submit the applications, PacifiCorp purposefully acts to
circumvent FERC jurisdiction and prevent FERC from acting on its application and issuing a
license with mandatory terms and conditions necessary to protect the Klamath River.

Shortly after the KHSA became effective, the Oregon DEQ agreed to PacifiCorp’s
request of holding the Section 401 certification proceeding in “abeyance.” In a March 29, 2010
letter to PacifiCorp’s legal counsel, ODEQ confirmed that it would accept PacifiCorp’s request
to not process its future applications for certification:
On March 22, 2010, the [ODEQ] received a request from [PacifiCorp] to hold in
abeyance further review of the application for water quality certification under
Section 401 of the Clean Water Act (CWA) for PacifiCorp Energy’s (PacifiCorp)
Klamath Hydroelectric Project (FERC No. 2082). . . . In accordance with Section
6.5 of the KHSA, ODEQ will hold in abeyance further processing of Klamath
Hydroelectric Project Section 401 applications submitted prior to a Secretarial
Determination. . . . During the period prior to a Secretarial Determination,
PacifiCorp will withdraw and resubmit its application to ODEQ for water quality
certification, as necessary to avoid waiver under the Clean Water Act.19

Similarly, on May 18, 2010, the California SWRCB passed Resolution No. 2010-0024,20
entitled “Request for Abeyance in Processing the Water Quality Certification Application of the
Klamath Hydroelectric Project.” The SWRCB resolved to: “hold in abeyance PacifiCorp’s
application for water quality certification for the Klamath Hydroelectric Project until removal of
the California mainstem facilities of the Project, except as provided in Paragraphs 2 and 3.” In
Paragraph 3, the SWRCB stated it would resume “processing” the certification application if
federal legislation implementing the KHSA is not introduced by June 18, 2010 or if the
Secretarial Determination does not occur by April 30, 2012. Neither of these conditions (federal
legislation or the Secretarial Determination) have yet occurred.

As the deadlines passed, instead of processing the certification application, SWRCB
simply changed the target dates and continued to abstain from its certification duties. On
October 5, 2010, the SWRCB passed Resolution No. 2010-0049, entitled “Regarding Further
Abeyance in Processing the Section 401 Water Quality Certification of the Klamath
Hydroelectric Project.” 21 Here, the SWRCB declared that: “PacifiCorp and [the Klamath Water
Users Association] request that the federal legislation requirement in Resolution 2010-0024 be
struck.” The SWRCB acceded to PacifiCorp’s request, resolving that: “The State Water Board
will change Resolution 2010-0024, paragraph 3, first bullet, to a deadline for enactment of
legislation, rather than introduction of legislation, and change the date from June 18, 2010 to
May 17, 2011 (one year after the timeline anticipated in the KHSA). No legislation was either
passed or introduced by May 17, 2011. Yet, this did not change the SWRCB’s course of action.

On June 21, 2011, PacifiCorp requested the SWRCB “to remove the requirement [in
Resolution 2010-0049] that federal legislation be enacted by a date certain since federal
legislation is not likely to be enacted before August 15, 2011 (90 days after May 17, 2011).” On
August 16, 2011, in Resolution 2011-0038,22 the SWRCB again agreed to PacifiCorp’s request,
deleting the requirement for enactment of legislation as a prerequisite for maintaining the
abeyance. However, enactment of legislation remains a prerequisite in the KHSA for project
decommissioning. The SWRCB resolution did retain the requirement for completion of the
Secretarial Determination by April 30, 2012. That deadline has now passed as well.

In summary, although PacifiCorp continues to submit, withdraw, and re-submit
applications for certification, it is clear that these submissions are not a good-faith or diligent
request for certification. To the contrary, PacifiCorp does not want the States to process its
applications and has affirmatively requested the States not to. The States have also agreed to
accept PacifiCorp’s applications, but not process them. As a result, PacifiCorp continues to
operate its Project on a license issued in 1954, the resources continue to suffer, and this relicensing moves no closer to closure.

This is not the first time that the Tribe has brought its concerns to FERC’s attention. In
February 2007, following Interior’s release of its final Section 4(e) prescriptions, the Tribe
moved FERC to impose some of those mandatory conditions as interim protective measures due
to the delay in re-licensing.23 In its Order Denying Rehearing, FERC addressed the Tribe’s
argument that the re-licensing was in a contractually-mandated state of delay due to the recent
signing of the AIP finding that “while this proposal contemplates further delay in issuing a new
license, we cannot be certain that delay is inevitable.”24 Since the Order on Rehearing, three
more years have passed with no action on the license to the detriment of the resources. FERC
must step in and reassert control over this proceeding, in accordance with its statutory duty.

III. ARGUMENT AND AUTHORITY

A. PACIFICORP HAS FAILED TO DILIGENTLY PURSUE WATER
QUALITY CERTIFICATION AND COMPLETION OF RE-LICENSING.

Under well-established FERC policy, “indefinite delays in processing applications are not
in the public interest.”25 Failure to diligently prosecute a license application is adequate grounds
for dismissal.26 FERC regulations require a licensee to diligently pursue water quality
certification. For example, a licensee must file within 60 days from the date of issuance of the
Ready for Environmental Analysis (REA) Notice: (a) a copy of the water quality certification;
(b) a copy of the request for certification, including proof of the date on which the certifying
agency received the request; or (c) evidence of waiver of water quality certification.27 FERC
expects certification to be obtained or applied for by the time the REA Notice is issued or shortly
thereafter.28 Once applied for, certification is to be obtained within one year.29

FERC issued its REA Notice for the Klamath Project re-licensing in December 2005,
approximately 78 months ago. On February 14, 2006, PacifiCorp asked FERC for a mere 30-day
extension of the deadline by which it was required to file its first application for certification.30
FERC initially denied this request, citing its “commitment to processing license applications in a
timely manner” and its determination in Order No. 2002 (July 23, 2003) that accepting a
certification application more than 60-days following REA Notice would result in “unduly
delaying the licensing process.”31 That 30-day extension request, resisted by FERC in 2006,
pales in comparison to the current 78-month delay that has resulted directly from PacifiCorp’s
failure to diligently prosecute its license application.

At this time, six and a half years after issuance of the REA Notice, PacifiCorp is taking
no action (and has no intent to take any action) to obtain a Section 401 certification. In fact,
PacifiCorp has secured written commitments from the States of Oregon and California to
purposefully and intentionally hold FERC’s re-licensing process in abeyance by means of not
issuing or taking action on a Section 401 certification.32 This arrangement effectively takes
away FERC’s licensing authority during the period of “abeyance” and also impairs the ability of
intervenors such as the Hoopa Valley Tribe to participate in the process. As a sovereign Indian
nation with a tribal water quality control plan approved by EPA under 33 U.S.C. § 1377(e), the
failure to obtain certification also impairs the Tribe’s rights to ensure Project-consistency with its
own downstream water quality standards.33

In sum, PacifiCorp’s scheme permits (without FERC consent or approval) PacifiCorp to
continue operating its Project on the Klamath River (perhaps indefinitely) on the terms of its
long-expired 1950’s era license without required mitigation or compliance with current law.
FERC should find and declare that PacifiCorp has failed and is failing to act with due diligence
in pursuing its Section 401 certification and completion of this re-licensing.

B. DUE TO PACIFICORP’S FAILURE TO DILIGENTLY PURSUE SECTION 401 CERTIFICATION OR LICENSE ISSUANCE, FERC SHOULD DISMISS PACIFICORP’S APPLICATION AND COMMENCE A PROCEEDING TO DECOMMISSION THE KLAMATH PROJECT

As described above, PacifiCorp is not diligently pursuing Section 401 certification or the
issuance of a new license in this proceeding. This is evidenced by the KHSA, PacifiCorp’s
written contract (entered into without FERC consent or approval and over the objection of
intervenors) to hold re-licensing in abeyance. PacifiCorp can make no reasonable showing that it
intends to obtain or pursue certification or a new license from the Commission.

The Commission has the statutory duty and obligation to regulate the use of public
navigable waters for development of hydropower.34 The Commission must make its licensing
determinations consistent with the public interest and must give equal consideration to fish and
wildlife resources.35 Upon expiration of a license term, the Commission may issue a new license
to the existing licensee upon such terms or conditions as are required under then existing laws
and regulations, or it may deny a license if denial is in the public interest.36 It is the Commission,
and no other jurisdiction, that has the ultimate statutory duty to ensure that licensees are
operating pursuant to valid licenses and in accordance with applicable law. Multi-year delays in
re-licensing proceedings are not in the public interest because they allow the licensee to continue
operating under the terms of annual licenses that do not conform with current law.37

Pursuant to its comprehensive authority under the Federal Power Act, FERC may decline
to issue a new license to an applicant seeking re-licensing.38 PacifiCorp, as evidenced by the
KHSA, has confirmed that it has no intent to pursue or obtain a Section 401 certification or a
new license for the Project. Yet, at the same time, PacifiCorp is currently under no contractual
obligation to decommission or remove the facilities of the Klamath Hydroelectric Project – as
none of the contingencies provided for in the KHSA have occurred. Nor is PacifiCorp being
required to operate the Project in conformance with currently applicable law. The current status
quo is not in the public interest. Upon finding that PacifiCorp is not diligently pursuing
licensing, FERC should proceed to dismiss PacifiCorp’s application and open a proceeding for
the decommissioning of the Klamath Hydroelectric Project facilities.39

C. ALTERNATIVELY, THE COMMISSION SHOULD FIND THAT THE STATES HAVE WAIVED THEIR SECTION 401 CERTIFICATION RIGHTS AND PROCEED TO ISSUE A LICENSE THAT INCLUDES MANDATORY SECTION 4(e) AND 18 PRESCRIPTIONS

In the alternative, if the Commission declines to dismiss PacifiCorp’s license application
for lack of diligent prosecution, it should find that the States have waived certification and
promptly proceed to issue a license to PacifiCorp for operation of the Klamath Hydroelectric
Project in accordance with the Department of Interior and Commerce’s mandatory Section 4(e)
and 18 prescriptions, in addition to other mitigation measures deemed appropriate by FERC in
accordance with its completed environmental analysis. Once FERC deems the certification
waived, as a matter of federal law, it can and should issue a license authorizing continued
operation in accordance with law and terminate this unduly protracted re-licensing proceeding.

Pursuant to Section 401(a)(1) of the Clean Water Act, hydroelectric license applicants
must obtain either: (1) state certification that any discharge from the project would comply with
applicable water quality standards; or (2) a waiver of certification by the appropriate state
agency.40  Under Section 401(a)(1), if the certifying agency “fails or refuses to act on a request
for certification, within a reasonable period of time (which shall not exceed one year) after
receipt of such request, the certification . . . shall be waived with respect to such Federal
application.”41 The Commission’s own regulations provide that a “certifying agency is deemed
to have waived the certification requirements of section 401(a)(1) of the Clean Water Act if the
certifying agency has not denied or granted certification by one year after the date the certifying
agency received a written request for certification.”42 Likewise, an EPA regulation, 40 C.F.R.
§ 121.16, governing certification provides:
The certification requirement with respect to an application for a license or permit
shall be waived upon: (a) Written notification from the State or interstate agency
concerned that it expressly waives its authority to act on a request for
certification; or (b) Written notification from the licensing or permitting agency to
the Regional Administrator of the failure of the State or interstate agency
concerned to act on such request for certification within a reasonable time after
receipt of such request, as determined by the licensing or permitting agency
(which period shall generally be considered to be 6 months, but in any event shall
not exceed one year).43

The Commission has the authority to determine whether the States have waived their
certification rights under Section 401 because this issue is purely a matter of federal law. Where
a petition raises issues of federal law by challenging a state certifying agency’s compliance with
the terms of Section 401 itself, then the federal licensing agency (e.g., FERC) must address it.44
The question of whether a state has waived certification under Section 401(a)(1), by failing to act
within the time required by that federal statute and out of compliance with Congressional intent,
is a question of federal law to be decided by FERC. Such a question involves no issues of state
law, but only whether state action has complied with the requirements of the Clean Water Act.

Here, the failure of the States to act within the time required by federal law is directly
precluding FERC’s ability to exercise its own statutory licensing authority under the Federal
Power Act. The facts presented in this case, where an applicant for re-licensing and a state
certifying agency agree to a scheme of repeated withdrawal and re-submission of Section 401
applications despite the lack of intent to process such applications or obtain certification, could
allow a licensee to continue operating indefinitely on an expired license. PacifiCorp essentially
contends that it can continue operating on the terms of its 1950’s era license as long as it can
keep the States to refrain from issuing a certification. Under PacifiCorp’s scheme, it is the States
– not FERC – that hold sole control over when and whether a new license will be issued. So
long as the States are willing participants, under PacifiCorp’s theory, this could continue forever.
This is not consistent with federal law and if FERC does not declare such practice unlawful,
FERC risks losing its jurisdiction over the re-licensing process entirely.

Both Congress, in the express language of Section 401 of the Clean Water Act, as well as
the EPA, in regulations implementing the Clean Water Act, have mandated that the certification
decision must happen within one year. The Commission’s own regulations also require timely
certification.45 The D.C. Circuit Court of Appeals recently stated: “In imposing a one-year time
limit on States to ‘act,’ Congress plainly intended to limit the amount of time that a State could
delay a federal licensing proceeding without making a decision on the certification request.”46
The Conference Report on Section 401 states that the one-year time limitation was meant to ensure that “sheer inactivity by the State . . . will not frustrate the Federal application.”47 “The
purpose of the waiver provision is to prevent a State from indefinitely delaying a federal
licensing proceeding by failing to issue a timely water quality certification under Section 401.”48

In Central Vermont Public Service Corporation, 113 FERC ¶ 61167 (Nov. 17, 2005),
FERC found the state agency waived certification by not acting within the one-year time frame.
The State argued that, “because it, [the license applicant], and other parties to the settlement
agreement had agreed to a process in which [the state] would not issue water quality certification
until after the Vermont Public Service Board approved certain aspects of the settlement, and
because the Board had not yet acted, it could not properly be said that [the state] failed to act
timely on the certification request.”49 The Commission rejected this argument, finding that
“Section 401 contains no provision authorizing either the Commission or the parties to extend
the statutory deadline.”50 The Commission added that “nothing in the Clean Water Act allows a
state to use procedures agreed to in a settlement to indefinitely extend the statutory deadline, nor,
as we have stated, do we endorse such delay.”51

The State, in Central Vermont, argued that it should not be required to “engage in the
overly formalistic and ministerial act of withdrawal and reapplication [of certification
applications].”52 The Commission was not asked to decide in Central Vermont whether the
“formalistic” practice of withdrawal and reapplication was consistent with Section 401(a)(1) or
sufficient to prevent a finding of waiver, but the Commission did note that this kind of “scheme”
is not “approved of, by the Commission.”53

Here, the Tribe requests that the Commission find that the States have affirmatively
waived their certification authority in this re-licensing proceeding because they have failed to act
on PacifiCorp’s certification request within one year and because they have made written
commitments to PacifiCorp agreeing that they will not take action on its certification requests.
The license applicant and the certifying agencies are flouting the language and intent of the
Clean Water Act and acting to “indefinitely extend the statutory deadline” for certification,
delaying the federal licensing process. Again, as noted above, absent FERC intervention, this
scheme could continue indefinitely, precluding FERC jurisdiction over the re-licensing as long
as the States are willing to refrain from issuing certification.

As a general matter, the Tribe disagrees that a State ever complies with Section 401(a)(1)
when it allows a license applicant to withdraw and re-submit a certification application solely for
the purpose of extending the one-year statutory deadline for action. Nothing in the Clean Water
Act supports such a technical charade and every indication from the language of the Act, its
implementing regulations, and legislative history is that actual action on the certification is
required within one year.54 However, the Tribe’s current petition does not require the
Commission to declare that the practice of “withdrawal and re-submission” is unlawful in every
instance. Here, the Tribe more narrowly asks the Commission to find that the States, in this
proceeding, have waived their certification authority where, under the facts presented here:
(a) the States have not acted within one year from the initial certification requests filed in March
2006; (b) more than six years have passed since the initial certification requests; (c) the failure to
obtain certification is resulting in delay in the licensing proceeding, which is in all other respects
complete; (d) the States have made affirmative written commitments to the license applicant, by
which the States have agreed to not process the certification requests and to effectively hold the
federal licensing proceeding in abeyance without FERC consent; and (e) the public interest is
being impaired by allowing the licensee to continue operation on the terms of an expired license
from 1954 without compliance with currently applicable law or conditions.

In this proceeding, the States have taken affirmative and intentional action to not comply
with their certification responsibilities solely for the purpose of delaying the federal licensing
proceeding. Nothing could be more inconsistent with Congressional intent. The Commission
need not, and must not, allow this infringement of federal law and authority. The Clean Water
Act, FERC regulation, and EPA regulation allow the Commission as a matter of federal law to
declare the certification waived and to proceed ahead with licensing of the Klamath Project.

Action by the Commission is necessary to prevent PacifiCorp and the States from
indefinitely blocking the issuance of a new license that will conform with current applicable law.
It is the intent of Section 401(a)(1) and the Commission’s own policy to minimize delay in
relicensing proceedings and issue a new license in a timely manner once a licensing docket is
ready for final decision.55 A finding that the States have waived certification under Section
401(a)(1) would permit the Commission to conclude this proceeding via issuance of a new
license to PacifiCorp. Such new license would have to incorporate the mandatory terms and
conditions prescribed by the Departments of Interior and Commerce under their Section 4(e) and
18 authorities.56 Conclusion of this proceeding and license issuance is necessary to bring the
Project into compliance with current law and provide long overdue mitigation to the aquatic
environment affected by the Klamath Project. 57

The re-licensing process in this case has lasted eight years (since PacifiCorp’s application
for re-licensing in 2004). Since 2006, PacifiCorp has operated on annual licenses that fail to
include critically necessary mitigation required under Section 4(e) and 18. The Klamath Project
license is ready for issuance. The only obstacle is the lack of a Section 401 certification, or
formal waiver, from the States. It is clear that the States do not intend to issue a certification or
formal waiver for years to come, if ever. In the meantime, the Project simply continues to
operate without compliance with current law. The public interest mandates that the Commission
re-assert its authority and render a final licensing decision.

IV. CONCLUSION.

The intervenor Hoopa Valley Tribe respectfully requests that the Commission
expeditiously issue an order dismissing PacifiCorp’s license application due to its failure to
diligently pursue water quality certification and re-licensing; or alternatively issue an order
finding that the States have waived their Section 401(a)(1) water quality certification with
respect to the Commission’s issuance of a new license for the Project.

Respectfully submitted this 25th day of May, 2012.
/s/ Thomas P. Schlosser
Thomas P. Schlosser
Thane D. Somerville
Morisset, Schlosser, Jozwiak & Somerville
801 Second Avenue, Suite 1115
Seattle, Washington 98104
Tel. 206-386-5200
Fax. 206-386-7322
t.schlosser@msaj.com
t.somerville@msaj.com
Attorneys for Hoopa Valley Tribe

Footnotes/Endnotes:

1 33 U.S.C. § 1341(a)(1).
2 PacifiCorp filed the Klamath Hydroelectric Settlement Agreement (KHSA) with the Commission on
March 5, 2010. FERC Elibrary Accession No. 20100305-5023. PacifiCorp did not request the
Commission to take any action with regards to the “settlement” nor has the Commission taken any such
action on the KHSA since that date.
3 Judge McKenna’s September 27, 2006 Decision and Findings of Fact are available in the FERC Record
at FERC Elibrary Accession No. 20061002-5081.
4 See DOI Modified 4(e) Conditions, January 22, 2007 (FERC Elibrary Accession No. 20070130-5034);
NMFS Modified Fishway Prescriptions (FERC Elibrary Accession No. 20070129-5059).
5 Escondido Mut. Water Co. v. La Jolla Band of Mission Indians, 466 U.S. 765, 777 (1984) (holding
FERC has no discretion to reject 4(e) conditions imposed by Interior); City of Tacoma v. FERC, 460 F.3d
53, 66-67 (D.C. Cir. 2006) (same).
6 See November 18, 2011 correspondence from Jeff C. Wright, Director, Office of Energy Projects to
Elizabeth Vasquez, FERC Elibrary Accession No. 20111118-3013; February 13, 2009 correspondence
from J. Mark Robinson, Director, Office of Energy Projects to Dorothy Rice, FERC Elibrary Accession
No. 20090213-3027 (identifying certification as last necessary step and stating “bringing this relicensing
proceeding to its conclusion is appropriate and may provide various measures to improve fisheries, water
quality and other project-affected resources”).
7 PacifiCorp filed the AIP with FERC on Nov. 24, 2008. FERC Elibrary Accession No. 20081124-5160.
8 KHSA, Section 6.5 (entitled “Abeyance of Relicensing Proceeding”).
9 FERC’s failure to take any action on the KHSA appears directly inconsistent with FERC’s Policy
Statement on Hydropower Licensing Settlements (PL06-5-00, September 21, 2006).
10 KHSA, Sections 3.3.1; 3.3.4; 3.3.5; 4.1.2.
11 KHSA, Section 7.2.1 (Definite Plan for Facilities Removal shall be developed upon an Affirmative
Determination (which is contingent on passage of federal legislation and required state and federal
funding authorizations) and States’ Concurrences).
12 The KHSA set a goal for introduction of federal legislation by no later than May 2010. Section
2.1.1.A. The Klamath Basin Economic Restoration Act of 2011, which would provide the Congressional
ratification required by the terms of the KHSA, was not introduced until November 10, 2011 (S.
1851/H.R. 3398). Since its introduction seven months ago, no action has occurred and no committee
hearings have been scheduled for either bill, suggesting little interest in such legislative action. This lack
of interest is likely tied to the connected agreement, the Klamath Basin Restoration Agreement, which
would require appropriation of approximately $1 billion in federal subsidies.
13 KHSA, Section 8.11.
14 Correspondence from SWRCB to PacifiCorp (April 27, 2006) (confirming receipt of PacifiCorp
application), FERC Elibrary Accession No. 20060509-0091.
15 Correspondence from SWRCB to PacifiCorp (March 30, 2007) (confirming receipt of PacifiCorp
withdrawal and resubmittal), FERC Elibrary Accession No. 20070419-0089.
16 Correspondence from SWRCB to PacifiCorp (Aug. 17, 2011) (confirming receipt of PacifiCorp
withdrawal and resubmittal), FERC Elibrary Accession No. 20110823-0006; Correspondence from
PacifiCorp to FERC (September 24, 2010) (transmitting copies of PacifiCorp withdrawal and
resubmittal), FERC Elibrary Accession No. 20100924-5064; Correspondence from PacifiCorp to FERC
(September 17, 2009) (same), FERC Elibrary Accession No. 20090917-5046.
17 Correspondence from PacifiCorp to FERC (January 5, 2012) (transmitting correspondence to ODEQ
withdrawing and re-submitting certification application), FERC Elibrary Accession No. 20120105-5101;
see also correspondence from PacifiCorp to FERC (February 11, 2010) (same), FERC Elibrary Accession
No. 20100212-5150.
18 See KHSA, Section 6.5 (providing that PacifiCorp agrees to “withdraw and re-file its applications for
Section 401 certifications as necessary to avoid the certifications being deemed waived under the CWA”).
19 FERC Elibrary Accession No. 20100330-5024 (emphasis added).
20 The three SWRCB resolutions are available at: FERC Elibrary Accession No. 20120104-5084.
21 FERC Elibrary Accession No. 20120104-5084.
22 FERC Elibrary Accession No. 20120104-5084.
23 Order Denying Motion for Interim License Conditions, 125 FERC ¶ 61,196 (Nov. 20, 2008).
24 Order Denying Rehearing, 126 FERC ¶ 61,236 (March 19, 2009).
25 Georgia-Pacific Corporation, 35 FERC ¶ 61,120, n. 8 (April 25, 1986); Town of Summersville, W. Va.
v. FERC, 780 F.2d 1034, 1040 (D.C. Cir. 1986).
26 In re Mountain Rhythm Resources, 90 FERC ¶ 61,088 (Jan. 31, 2000) (dismissing license application
for failure to show due diligence in prosecution of CZMA certification); see also In re Swift River
Company, 41 FERC ¶ 61,146 (Nov. 6, 1987) (requiring applicant whose Section 401 certification was
denied to exercise due diligence in pursuing any available appeal remedies).
27 18 C.F.R. § 4.34(b)(5)(i).
28 See Order No. 2002, Hydroelectric Licensing Under the Federal Power Act, 104 FERC ¶ 61,109, P 264,
254-265 (July 23, 2003) (explaining why “the latest date we can accept for filing of the water quality
certification application is 60 days following the REA notice for all processes”).
29 33 U.S.C. § 1341(a)(1); 18 C.F.R. § 4.34(b)(5)(iii).
30 Correspondence from J. Mark Robinson, Director, Office of Energy Projects to PacifiCorp (Feb. 15,
2006), FERC Elibrary Accession No. 20060215-3009.
31 Id.
32 FERC Elibrary Accession No. 20100330-5024; FERC Elibrary Accession No. 20120104-5084.
33 Wisconsin v. EPA, 266 F.3d 741, 748-749 (7th Cir. 2001); City of Albuquerque v. Browner, 97 F.3d 415
(10th Cir. 1996); 33 U.S.C. § 1341(a)(2); 33 U.S.C. § 1377(e); 40 C.F.R. §§ 121.11-121.16; 40 C.F.R.
§ 131.7.
34 16 U.S.C. § 797; 16 U.S.C. § 803.
35 16 U.S.C. § 797(e); 16 U.S.C. § 803(a); In re Edwards Mfg. Co., Inc., 81 FERC ¶ 61255, 62210 (Nov.
25, 1997) (finding that “the public interest in this proceeding lies in our denying the license application
and requiring the licensees to remove Edwards Dam”).
36 16 U.S.C. § 808(a); FERC Policy Statement on Project Decommissioning at Relicensing, 60 Fed. Reg.
339 (January 4, 1995) (finding that the Commission has authority to deny a new license at the time of relicensing
and to require decommissioning).
37 16 U.S.C. § 808(a); Platte River Whooping Crane Critical Habitat Maintenance Trust v. FERC, 876
F.2d 109 (D.C. Cir. 1989).
38 City of Tacoma v. FERC, 460 F.3d 53, 71-74 (D.C. Cir. 2006) (discussing FERC authority to deny
re-license applications); In re Edwards Mfg. Co., Inc., 81 FERC ¶ 61255 (Nov. 25, 1997) (denying
application for new license and directing applicant to file a plan to decommission and remove facilities);
see also 18 C.F.R. § 4.32(g) (noting FERC authority to “dismiss the application, hold it in abeyance, or
take other appropriate action” if an applicant fails to provide required information or documentation in the
application process).
39 In re Edwards Mfg. Co., Inc., 81 FERC ¶ 61225 (Nov. 25, 1997); FERC Policy Statement on Project
Decommissioning at Relicensing, 60 Fed. Reg. 339 (January 4, 1995).
40 33 U.S.C. § 1341(a)(1).
41 33 U.S.C. § 1341(a)(1) (emphasis added).
42 18 C.F.R. § 4.34(b)(5)(iii).
43 40 C.F.R. § 121.16 (emphasis added).
44 Alcoa Power Generating Facility, Inc., v. FERC, 643 F.3d 963, 971-72 (D.C. Cir. 2011); City of
Tacoma, Washington v. FERC, 460 F.3d 53, 67-68 (D.C. Cir. 2006).
45 18 C.F.R. § 4.34(b)(5).
46Alcoa Power Generating Inc. v. FERC, 643 F.3d 963, 972 (D.C. Cir. 2011). See also Central Vermont
Public Service Corporation, 113 FERC ¶ 61167, 61653, P 18 (Nov. 17, 2005) (“Congress included a time
limit in section 401 ‘to prevent a state from dragging its feet to stall a federal permit or license’”).
47 Id., citing H.R. Rep. 91-940, at 56 (1970), reprinted in 1970 U.S.C.C.A.N. 2691, 2741. See also
Airport Cmtys. Coal. v. Graves, 280 F. Supp. 2d 1207, 1215-1216 (W.D. Wash. 2003) (“Whether a state
begins to act but does not complete the issuance of a certification or whether the state entirely fails to act
at all, the legislative history of Section 401 makes clear that either of those two situations was
unacceptable to Congress because both result in delays in issuing Federal permits.”); Central Vermont
Public Service Corporation, 113 FERC ¶ 61167, 61653 (Nov. 17, 2005) (“had Congress intended for
states to have an indefinite period to act on certification applications, it would not have revised section
401 to include the one-year deadline”); 33 U.S.C. § 1251(f) (declaring the national policy of avoiding
unnecessary delays at all levels of government in implementing the CWA).
48 Alcoa Power Generating Inc., 643 F.3d at 972.
49 Central Vermont Public Service Corporation, 113 FERC ¶ 61167, 61653, P 15 (Nov. 17, 2005)
50 Id., at P 16.
51 Id., at P 19.
52 Id., at P 15.
53 Id., at P 16.
54 Alcoa Power Generating, Inc. v. FERC, 643 F.3d 963, 973-74 (D.C. Cir. 2011); see also Airport Cmtys.
Coal. v. Graves, 280 F. Supp. 2d 1207, 1215-1216 (W.D. Wash. 2003).
55 See Flambeau Hydro, LLC, 113 FERC ¶ 61,291, at P 9 (Dec. 20, 2005) (stating that “the public interest
in the timely completion of relicensing proceedings requires us to act when our record is complete”).
56 Escondido Mut. Water Co. v. La Jolla Band of Mission Indians, 466 U.S. 765, 777 (1984) (holding
FERC has no discretion to reject 4(e) conditions imposed by Interior); City of Tacoma v. FERC, 460 F.3d
53, 66-67 (D.C. Cir. 2006) (same).
57 A license issued following the Commission’s determination of waiver would still include conditions for the protection of water quality. Georgia-Pacific Corporation, 35 FERC ¶ 61120, n. 8 (April 25, 1986) (stating, “the Commission has an independent responsibility under Section 10(a) of the Federal Power Act to insure that any license issued contains adequate provision for water quality”).